Properly working equipment can make or break a business, especially when it’s seasonal. Even losing one day due to a power or equipment failure can cost thousands and leave customers with a bad taste.
A ski club owner in The Blue Mountains, Ontario, was concerned about losing the use of one of his lifts due to a concrete floor that had settled 2 inches. Beneath the floor was a conduit pipe that housed electrical cables and powered the ski lift, and the sinking floor was putting stress on the pipe. Not only could this cause a power outage, but it could also start a fire, shutting down the club and potentially hurting someone.
Wanting to deal with the situation before it caused an emergency, the owner reached out to Canadian Concrete Leveling. Project Manager Joe McColl travelled to the ski club to meet with the customer for a free inspection. After checking out the building, it was clear to Joe that our PolyLevel® System could lift the concrete floor and remove the stress on the pipe.
Foreman Bill McKeown and Installation Specialist Mark Sealy started by drilling dime-sized holes in the concrete, being careful not to hit the pipe. They injected our PolyLevel® Polymer beneath the floor, lifting and leveling it to the base of the wall. Any voids beneath the floor were also filled, stabilizing the concrete to prevent any future sinking.
The ski club owner is very pleased that there is no longer a risk of power failure or fire. His customers can rest assured knowing their day on the slopes won’t be impacted, and the customer is looking forward to a great winter in The Blue Mountains!